Friday 6 March 2009

REPLACING LONDONS VICTORIAN DRAINS.....




We demolished a building to put a new structure on the site and  thought we had covered all the bases.  Not all - a retained structural party wall was floating above a 1500mm dia abandoned Victorian storm drain running 17m along  just below the depth of our trial pits . Clearly the wall was build illegally a long time ago.  33 m3   of concrete later we were able to carry on building.....

No comments:

Post a Comment